  • E-ON Data Centre Nottinghamshire

    Project Name: Data Centre Facility (for E-On UK)

    Client: Portal Ltd

    Role: Main Contractor

    Scope of works: -

    • Close Controlled Cooling 0.75 MW
    • 1.25 MW Generator
    • 1 MW of UPS backup (total 0.75 MW N+1)
    • Power Distribution
    • Internal/External Construction
    • CAT 6 UTP
    • Fibre Optic Cabling, Lighting
    • Fire Detection, Fire Suppression, Water Leak Detection, Vesda
    • BMS, Security, electrical & physical
    • Commencement to handover in 20 weeks

    To find out more about the work undertaken please

  • “Our experience working with Polar Air Ltd on various projects throughout the United Kingdom from initial design through to completion has been excellent, culminating in all projects being completed on time and on budget and in a professional manner.

     

    Their ability to understand our end user requirements were specifically noticeable, which allowed the easy transistion of new facilities to be integrated in a fully occupied building providing significant enhancements and expansion of our Sky facility in Leeds.

     

    The team demonstrated flexibility in accommodating our exacting requirements to ensure deadlines were met with minimal disruption to the facilities daily operations. 

     

    We continue to engage with Polar Air Ltd on numerous projects and would have no hesitation in recommending their services”

    Derek Clogg, Portal Operations and Projects Director