Air conditioning, mechanical and electrical service and maintenance specialists.

Hampton by Hilton

Home | Projects | Hampton by Hilton

Full air conditioning install for leading UK hotel chain

Our Approach

A 17-storey hotel consisting of 285 bedrooms located in the heart of Birmingham, required removal and replacement of all the existing VRV Refrigerant Air Conditioning systems, Bedroom MVHR units, Bedroom Refrigerant Leak Detection Systems.

Polar Air carried out the works under a JCT Design & Build Contract whilst the hotel remained operational.

Full scope of works

VRF Air Conditioning to 285 Bedrooms
Mechanical Ventilation Heat Recovery Units
Refrigerant Leak Detection System
hotel buffet area fit out nottingham
Client
Cumberland House BPRA Property Fund LLP
Sector
Leisure & Hospitality
Our Services

I was very impressed with the installation and wanted to let you know that the engineers were excellent. I will have no hesitation in recommending Polar Air to other practice managers.

Linda
Chilwell Valley Surgery

Prompt professional service provided every time. Have used Polar Air to install and maintain our units for years and have never been disappointed with their service.

Dianne S

We would be happy to use Polar Air for future projects and have no hesitation in recommending their services to other companies.

Ameera
Facilities Head Office and Project Manager, Vanquis Bank

Just a quick email to thank Polar Air for a great job.  Installation guys were fantastic, everything looks good and they cleaned up thoroughly, please pass on my thanks.

Phil
Installations Manager, Metreel Ltd

On a final note, I would like to express my sincere thanks for your continuing support with the YMCA.

Mark
Facility Manager, YMCA Nottinghamshire

Having used Polar Air for our new air conditioning installation at our Nottingham branch I would just like to state the service levels received were exemplary from start to finish.

John
Operations Director, No1 Currency