• E-ON | Data Centre

    Project Name: Data Centre Facility (for E-On UK)

    Client: Portal Ltd

    Role: Main Contractor

    Scope of works: -

    • Close Controlled Cooling 0.75 MW
    • 1.25 MW Generator
    • 1 MW of UPS backup (total 0.75 MW N+1)
    • Power Distribution
    • Internal/External Construction
    • CAT 6 UTP
    • Fibre Optic Cabling, Lighting
    • Fire Detection, Fire Suppression, Water Leak Detection, Vesda
    • BMS, Security, electrical & physical
    • Commencement to handover in 20 weeks

    To find out more about the work undertaken please

  • “Our experience working with the team at Polar Air Ltd on various projects from initial design and meetings through to completion has been an excellent one to date culminating in such projects being completed on-time, on budget in a professional manner.

     

    An example of their ability to understand our and that of our clients requirements were specifically noticeable in relation to an initial day one requirement and subsequent re-stack and expansion in delivering essentially two phased projects at our facility in Leeds, the team demonstrated their flexibility accommodating all our exact requirements notwithstanding assisting other contractors to make sure deadlines were met not going unnoticed showing an overall aptitude throughout to ensure the overall project experience was a good one.

     

    We continue to engage with Polar Air Ltd due to our successful working relationship to date and I would have no hesitation in recommending their services”

    Derek Clogg, Portal Operations and Projects Director